Progress continues in Orangeville with ongoing roadwork, sidewalk work, and more. Here's your construction breakdown for the week of August 27 to 30:
- Alder Street (C-Line to Rayburn Drive) – Closed August 28 and 29 for road resurfacing.
- College Avenue – Sidewalk repairs.
- Broadway (east of Wellington Street to west of Townline) – Eastbound lane resurfacing.
- St. Andrew Drive and Meadow Drive: Surface course paving.
- Rustic Crescent: Surface course paving.
- Victoria Street: Continued work on sewer replacement and service connections.
- Dawson Road (Madison Avenue to Lawrence Avenue): Surface course paving.
- Third Street (Broadway to First Avenue): Asphalt milling and paving.
- C-Line and Centennial Road: Catch basin repair.
- Broadway (various locations): Sidewalk and catch basin repairs
- Broadway and Wellington Street – Construction of a new PXO.
- Rotary Park – Watermain replacement.
- Caledon-East Garafraxa Townline (Townline to Dawson Road) – Asphalt milling and paving.
- Broadway - Westbound right lane reduction: Due to Construction at the Avalon.
For more information visit orangeville.ca/Construction